No-Hub Coupling Installation & Inspection Checklist
- Pre-Installation Check
- Pipe ends clean, smooth, no burrs, no rust, no grease
- Pipe diameter within standard DN50–DN200 range
- Rubber gasket undamaged, no cracks or deformation
- Stainless steel shield complete, bolts/nuts complete and functional
- Pipe alignment prepared, installation space sufficient
- Installation Procedure
- Slide rubber gasket fully onto one pipe end
- Butt two pipe ends tightly, keep gap minimal
- Center rubber gasket over the joint
- Place stainless steel shield over gasket
- Tighten bolts crosswise and gradually to recommended torque
- Do not over-tighten to avoid gasket damage
- Final Inspection
- Gasket evenly compressed, no extrusion or distortion
- Coupling firmly clamped, no looseness
- Pipes well-aligned, no obvious deflection
- No leakage after water/air test
- Rotate and check for no friction or interference
- Installation meets ASTM C1277 / ASTM A888 standard
## grip type coupling for stainless steel pipe
## sprinkler Hose Clamps
## pipe fittings carbon steel pipe fittings ceiling pipe hanger pipe fittings coupling upc No Hub Coupling suppliers pipe hanger clamp pipe riser clamp
## https://www.tjtccoupling.com/no-hub-coupling/
## https://www.tjtccoupling.com/